The turnkey projects will focus on upgrading 11 kV overhead distribution lines to Medium Voltage Covered Conductor (MVCC) systems, strengthening power distribution infrastructure across Gujarat.
- Buildonomics Staff
The turnkey projects will focus on upgrading 11 kV overhead distribution lines to Medium Voltage Covered Conductor (MVCC) systems, strengthening power distribution infrastructure across Gujarat.
- Buildonomics Staff